Drain, waste, and vent is the heart of the plumbing exam. If you know how drainage is laid out, sized, and protected, a big chunk of the test gets easier.
These 15 questions cover slope, fittings and changes of direction, traps and trap seals, cleanouts, and fixture unit loads. They all use rules that hold under both the IPC and the UPC.
-
Question 1 of 15
What actually goes wrong when a sanitary tee is used to turn a stack into a horizontal drain?
Show answerHide answer
Answer: D. Water falling down the stack meets a square shoulder instead of a sweep, so it is stopped rather than turned
A sanitary tee has a short-radius branch designed to take flow arriving horizontally and turn it downward. Stand it on its back and the geometry is being asked to do the opposite job: water falling the height of the stack arrives at what is now a flat shoulder, and it is halted and thrown sideways rather than swept round. The consequences are splashing back up the branch, solids dropping out where the flow stalls, and pressures in the stack that pull traps. A swept fitting keeps the water moving through the turn, which is what the permitted patterns all have in common.
-
Question 2 of 15
What is the maximum liquid seal depth for a fixture trap, before any exception applies?
Show answerHide answer
Answer: C. 4 in.
Both codes cap the seal at 4 in. A maximum exists because a deeper seal holds more standing water than the flow through the trap can scour, so solids settle in it. The trap has to be deep enough to survive pressure swings and shallow enough to keep itself clean.
-
Question 3 of 15
A load calculation gives a pipe size, and a separate provision of the same code states a minimum size for that run which is larger. Which controls?
Show answerHide answer
Answer: C. The larger of the two, because both requirements have to be met at once
Both requirements apply, so the pipe has to satisfy both, and satisfying both means taking the larger. Neither code presents its minimums as alternatives to the load tables; they sit alongside them and cut in where the load alone would allow something the code will not. The IPC does it with the footnote requiring a 3 in. building drain for any water closet, the UPC with notes barring a water closet from 2 in. pipe and capping a 3 in. run at six closets. In every case the effect is the same: the load table gives a floor and the minimum can raise it, never lower it.
-
Question 4 of 15
A 4 in. building drain leaves a building. May the building sewer that continues it be 3 in. if the load would fit in 3 in. pipe?
Show answerHide answer
Answer: D. No. A sewer continuing a 4 in. drain may not be smaller than the drain
No, under both codes. The UPC says it outright in Section 717.1: no building sewer shall be smaller than the building drain. The IPC gets there through Section 704.2, which prohibits reducing the size of drainage piping in the direction of flow, and a sewer continuing a drain is the same line of flow. Neither depends on whether the smaller pipe could carry the load, which it very often could, and that is exactly what makes the reduction tempting.
-
Question 5 of 15
A drinking fountain is installed in a public corridor. What drainage fixture unit value do both codes give it?
Show answerHide answer
Answer: C. One half
One half. The IPC gives 1/2 in Table 709.1 and the UPC gives 0.5 for private and public use in Table 702.1. It is the smallest load either code assigns to a fixture that actually discharges, which reflects both the quantity and the pattern: a fountain passes very little water and most of what it passes goes down while somebody is standing there. Note that the UPC raises it to 1.0 in assembly use, so the two codes agree in public use and part company in a column the IPC does not have.
-
Question 6 of 15
A cleanout is installed in a paved area that vehicles will drive over. What do both codes require of the assembly?
Show answerHide answer
Answer: D. That it be rated for the loading, in accordance with ASME A112.36.2M
Both codes point to the same standard. The IPC requires cleanout assemblies conforming to ASME A112.36.2M where a plug must be protected from the loads of vehicular traffic, and the UPC requires cleanout floor covers and top rims meant to take loads to be rated for the loading in accordance with ASME A112.36.2M. A cover that carries no load rating is not made acceptable by being set in something strong; the rating belongs to the assembly.
-
Question 7 of 15
Under both codes, a sanitary tee is a permitted fitting for which change in direction?
Show answerHide answer
Answer: B. Horizontal to vertical
Horizontal to vertical, and only that. The IPC marks the sanitary tee with an X in the horizontal-to-vertical column of Table 706.3 and with a dash in the other two. The UPC names the sanitary tee in its horizontal-to-vertical list in Section 706.2 and does not name it in Section 706.3 or Section 706.4. A horizontal branch dropping into a vertical stack is the one arrangement the pattern suits, because the branch arrives at the stack travelling horizontally and turns down with gravity rather than against it.
-
Question 8 of 15
A trap seal is being lost to siphonage. What addresses the cause?
Show answerHide answer
Answer: C. Correct venting of the fixture
Siphonage happens because pressure on the outlet side falls and nothing lets air in to relieve it. A correctly placed vent supplies that air, so the pressure never drops far enough to pull the seal. A deeper seal and a primer both treat symptoms: the primer refills a seal that keeps being lost, which is the answer for evaporation rather than for siphonage.
-
Question 9 of 15
Two identical horizontal drains carry the same load, one at 1/4 in. per ft and one at 1/8 in. per ft. What do both codes say about their capacity?
Show answerHide answer
Answer: B. The flatter drain carries fewer fixture units, so it may need to be a larger pipe
Capacity falls as the drain gets flatter, and both codes carry that. The IPC prints a separate capacity for each of four slopes in Table 710.1(1). The UPC prints one set of values based on 1/4 in. per ft and multiplies horizontal fixture units by 0.8 for 1/8 in. per ft. The physical reason is the same in both: a flatter drain runs slower, so it must run fuller to pass the same flow, and the codes will not let it run beyond a certain depth. The methods differ completely and the direction does not.
-
Question 10 of 15
The public sewer in the street is a combined system taking both sanitary and storm water. How is the building sanitary sewer connected to it?
Show answerHide answer
Answer: B. Independently to the public sewer
Independently. IPC Section 703.6 states that where the public sewer is a combined system, the sanitary sewer shall be connected independently to it. The building keeps its systems separate right up to the connection, so that the sanitary line can be tested, cleaned and traced as a sanitary line, and so that the arrangement still works if the public system is ever separated. The UPC reaches the same territory from the other side in Section 714.3, prohibiting particular connections into a building sewer leading to a public sewer.
-
Question 11 of 15
A drainage load calculation for a public toilet room rates each flush tank water closet at 5.0. What has most likely gone wrong?
Show answerHide answer
Answer: C. A water supply fixture unit value has been carried into a drainage calculation
5.0 is the water supply fixture unit value the IPC gives a public flush tank water closet. On the drainage side the same fixture is 4 under the IPC and 4.0 under the UPC in public use. The number is real and it belongs to the other side of the building. This is the single most likely error in the subject and it is invisible in the arithmetic, because 5.0 is a perfectly plausible drainage figure: a public water closet flushing above 1.6 gpf is 6, so nothing about 5.0 looks absurd until you ask which table it came out of.
-
Question 12 of 15
What maximum interval do both codes apply to cleanouts on a long horizontal drainage run?
Show answerHide answer
Answer: C. 100 ft
100 ft. It is one of the few figures in this subject that carries across: the IPC requires cleanouts on horizontal drainage pipes and building drains at intervals of not more than 100 ft, and the UPC requires a cleanout for each 100 ft, or fraction thereof, on any run more than 100 ft in total developed length. How the two codes then COUNT the resulting cleanouts is not the same, and neither is anything else in this subject, so the agreement should not be generalised.
-
Question 13 of 15
A stack is turned to horizontal at its base using a sanitary tee laid on its back. Under both codes, is that acceptable?
Show answerHide answer
Answer: C. No. Neither code permits a sanitary tee for a vertical-to-horizontal change
Neither code allows it. The IPC puts a dash against the sanitary tee in the vertical-to-horizontal column of Table 706.3, which is one of only two dashes in the whole table. The UPC does not name the sanitary tee in Section 706.4, whose list closes with fittings of equivalent sweep, and a sanitary tee has no sweep for anything to be equivalent to. This is the single most-tested fact in the subject and the one most often got wrong on site, because the fitting physically assembles and looks reasonable.
-
Question 14 of 15
What separates siphonage from backpressure as causes of trap seal loss?
Show answerHide answer
Answer: C. Siphonage pulls; backpressure pushes
Both are pressure problems and the sign is what separates them. Siphonage is negative pressure on the outlet side pulling the seal down the drain, leaving the trap dry and quiet. Backpressure is positive pressure pushing the seal back up into the fixture, usually noisily. Candidates conflate the two constantly, and the symptom tells them apart: quietly dry against bubbling and spitting.
-
Question 15 of 15
A building drain picks up branches along its length, so the load it carries at its downstream end is larger than at its upstream end. How is it sized?
Show answerHide answer
Answer: D. On the load connected to each portion, so the drain may step up in the direction of flow
Each portion is sized for what is connected to it. The IPC table is headed with the maximum fixture units connected to ANY PORTION of the building drain, and the UPC table gives the maximum allowed on a pipe of a given size. So a drain may legitimately start small and step up as branches join it, and the size is checked portion by portion in the direction of flow. What it may never do is step DOWN in the direction of flow, which is a separate prohibition.
If you missed fitting questions, think about which way the flow is going. A lot of the change of direction rules depend on whether the pipe is going horizontal to vertical or the other way.
Cleanout questions are easy points once you memorize the main locations. Make a short list and review it before the exam.
Want more questions like these?
Journeyman Plumber Pro has 1,800+ practice questions with explanations, timed practice exams, and weak-area drills.