This is a mixed practice test pulled from every part of the journeyman plumber exam: drainage, venting, water supply, water heaters, fixtures, backflow, safety, and math.
Every question here uses a rule that holds under both the IPC and the UPC, so it works no matter which code your state uses. Take it without your book first to see where you really stand.
-
Question 1 of 20
The developed length of a run of piping is measured:
Show answerHide answer
Answer: A. Along the centerline of pipe and fittings, following the actual route
Developed length follows the centerline of the pipe and fittings along the route the piping actually takes, so every offset and rise is included. The straight-line answer is the common error, and it matters because developed length is an input to both vent and water sizing: understating it by ignoring offsets produces an undersized result.
-
Question 2 of 20
A double check assembly passed its test at installation three years ago and has not been tested since. The owner argues that nothing has changed. What is the flaw in that argument?
Show answerHide answer
Answer: D. Check seats foul and wear, and failure shows no outward sign
A double check has no relief port, no discharge and no external symptom, so a fouled or worn check produces exactly the same appearance as a sound one: water flows the right way and nothing leaks. Grit, scale and debris pass through these seats continually, and elastomers take a set. That is why both codes tie testing to a schedule rather than to symptoms, and why testability is designed into an assembly in the first place. The owner's argument would be sound if a failure announced itself, and the whole difficulty is that it does not.
-
Question 3 of 20
For this problem the required ratio is 1 lavatory per 100 occupants. A facility serves 102 occupants. How many lavatories are required?
Show answerHide answer
Answer: C. 2, since any fraction requires the next whole fixture
102 divided by 100 is 1.02, and any fraction rounds up, giving 2. Both of the wrong ones apply ordinary arithmetic rounding, under which 1.02 becomes 1. Fixture-count rounding is not to-nearest; it is always upward, because those two extra occupants still need a fixture.
-
Question 4 of 20
A vent system must keep a trap seal from being exposed to a pressure differential greater than what?
Show answerHide answer
Answer: C. 1 in. of water column
1 inch of water column. Both codes give that figure, and every other rule in the venting chapter is a means of delivering it: the trap-arm limits, the vent sizes, the connection heights and the termination rules all exist so that no trap ever sees more than that. It is a very small pressure, which is the point. A trap seal is typically 2 in. deep, so a differential much beyond an inch starts moving the seal bodily.
-
Question 5 of 20
A line normally runs at 120 degrees F but reaches 180 degrees F during a sanitising cycle. The pipe is listed at 160 psi at 120 degrees F and 80 psi at 180 degrees F. The system runs at 90 psi throughout. What is the problem?
Show answerHide answer
Answer: B. At 180 degrees F the rating is 80 psi, which 90 psi exceeds
The pipe must hold at the conditions it actually sees, and during the cycle that is 90 psi against a rating of 80 psi at 180 degrees F. Checking against the 120 degrees F figure passes a system that fails in service. The worst combination of pressure and temperature is the one to design against, even when it happens rarely.
-
Question 6 of 20
A double check backflow prevention assembly is proposed on a connection carrying a substance that could cause illness. Is that acceptable?
Show answerHide answer
Answer: B. No, because a double check assembly is rated for low hazard only
A double check assembly covers both mechanisms and lives under continuous pressure without complaint, which is precisely why its limit gets missed: it looks capable. Both codes rate it for low hazard only, and the UPC table makes it visual by marking backsiphonage and backpressure under pollution and leaving both contamination columns blank. Anything that could cause illness is contamination, and that calls for a reduced pressure principle assembly instead.
-
Question 7 of 20
Which observation points to thermal expansion rather than to excessive supply pressure?
Show answerHide answer
Answer: A. A peak above street pressure, appearing only after heating
Two things identify expansion. First, the magnitude: a peak above the street pressure cannot have come from the street, and only heated water can generate it inside the building. Second, the timing: it tracks the heating cycle and disappears when the heater is idle. Excessive supply pressure, by contrast, is steady and present at rest. The hot-side reading is worth noting because it sounds plausible and is not: pressure is transmitted through the heater to the cold piping as well, so a closed system under expansion reads high on both sides.
-
Question 8 of 20
At the service side of a water heater installed in an attic, both codes require a level space of what size?
Show answerHide answer
Answer: C. 30 in. by 30 in.
The IPC calls it a level service space not less than 30 inches in length and 30 inches in width at the front or service side (Section 502.3). The UPC calls it a level working platform not less than 30 inches by 30 inches in front of the service side of the appliance (Section 508.4.3). Different words, identical figures. It is a space to kneel and work in, which is why both codes also insist it be level.
-
Question 9 of 20
A clothes washer is connected with hoses that are live whenever the supply valves are open. What matters about them?
Show answerHide answer
Answer: C. They must be rated for continuous pressure
Washer hoses hold full supply pressure whenever the valves are open, which for most installations is all the time, so they must be rated for that duty. A burst hose delivers water continuously until someone finds it, which is why reinforced hoses and closing the valves when a machine is unused both matter.
-
Question 10 of 20
A jetter is proposed to clear a recurring blockage. What should be established first?
Show answerHide answer
Answer: C. Whether the line can take the pressure
A jetter is effective on grease and soft blockages but applies substantial pressure to the pipe wall. In a line that is already cracked, badly corroded or poorly jointed it can worsen the damage, so establishing the line condition, usually by camera, comes first. Recurring blockages are exactly the case where an underlying defect is likely.
-
Question 11 of 20
A task is estimated at 16 man-hours. A crew of two works it. How long does it take in elapsed time, and what is billed?
Show answerHide answer
Answer: C. 8 hours elapsed, 16 hours billed
Two workers cover 16 man-hours in 8 elapsed hours, but all 16 man-hours are billed because both were paid for the whole time. Answering 8 hours elapsed and 8 hours billed is the tempting one: adding a second worker shortens the job without reducing what it costs in labour, and confusing the two is how a crewed job gets under-billed.
-
Question 12 of 20
Using 0.434 psi per ft, how much pressure is required simply to lift water 25 ft?
Show answerHide answer
Answer: B. 10.85 psi
25 x 0.434 = 10.85 psi. This is the pressure consumed by height alone, before any friction loss is considered, which is why it is calculated first in a multi-step problem. Choosing 57.6 divides by 0.434 and produces more pressure than most supplies deliver.
-
Question 13 of 20
Water appears under a lavatory only while the faucet is running, and stops as soon as it is shut off. Where should you look first?
Show answerHide answer
Answer: B. At the faucet shanks
A leak that starts and stops with the faucet is on the pressurised side: the faucet shanks, the coupling nuts or the risers. Water running down the outside of a shank often drips at the lowest point and looks like a trap leak, which is why the timing matters more than where the drip lands.
-
Question 14 of 20
Arriving at a job you find both an unguarded floor opening near the work area and a badly coiled extension lead across the walkway. Neither is yours. What is the reasonable response?
Show answerHide answer
Answer: A. Address both before starting, dealing first with the one that could cause the most serious harm
Address BOTH before starting, dealing first with the one that could cause the most serious harm, which is the floor opening. Ranking by consequence is the habit worth building: a trip over a lead is likely and usually minor, while a fall through an opening is less likely and can be fatal, and the second outranks the first. The answer about waiting for the responsible trade is the one worth arguing with, because it sounds correct and leaves both hazards live in the meantime. Covering an opening and coiling a lead take a minute between them. Reporting still happens; it is what you do IN ADDITION, so the condition is fixed at source and not just today.
-
Question 15 of 20
A plumber notices the smell of rotten eggs near an open sewer manhole, and a few minutes later cannot smell it at all. What does that suggest?
Show answerHide answer
Answer: A. Gas may still be present; high levels deaden smell
That the gas MAY STILL BE PRESENT OR RISING, because hydrogen sulfide at higher concentrations DEADENS THE SENSE OF SMELL. The rotten-egg odour is noticeable at very low levels and disappears as the concentration climbs, so losing the smell can mean the exposure has become more dangerous, not less. That is why the atmosphere of a sewer structure is tested with an instrument before entry and monitored during it, rather than judged by smell or by how it seems. The gas is also heavier than air and collects at the bottom of manholes and wet wells, which is precisely where the work is.
-
Question 16 of 20
Why does a horizontal drain carry fewer fixture units at 1/8 in. per ft than at 1/4 in. per ft?
Show answerHide answer
Answer: B. It flows more slowly, so it must run fuller to pass the same quantity
Velocity falls with slope, and a slower stream has to occupy more of the pipe to pass the same quantity. Both codes cap how full a drainage pipe may run, because the space above the flow is what carries air and keeps pressures in the system stable. So a flatter drain reaches that cap at a lower flow, which is what the reduced capacity expresses. It is not a safety margin bolted on; it is the same pipe doing less work because the water is moving more slowly through it.
-
Question 17 of 20
What is an offset in drainage piping?
Show answerHide answer
Answer: B. A combination of bends that brings one section of pipe out of line but parallel with the other
An offset is a combination of approved bends making TWO changes in direction, bringing one section of the pipe out of line but into a line parallel with the other section. That it is two changes matters, because each end is its own transition and the fittings permitted at the two ends are not necessarily the same. Whether the offset counts as horizontal or vertical is then settled by the angle: a pipe at 45 degrees or more from horizontal is vertical, and below that it is horizontal.
-
Question 18 of 20
A run has a developed length of 90 ft, and its fittings are assessed at 18 ft. What does that 18 ft represent?
Show answerHide answer
Answer: B. The extra straight pipe that would lose the same pressure as those fittings do
A friction chart is entered with a length of pipe, so a fitting's loss has to be expressed the same way. The allowance is the number of feet of straight pipe of that size which would lose the same pressure as the fitting. Adding it to the developed length gives the equivalent length, and that total, not the measured length, is what the friction calculation uses.
-
Question 19 of 20
A shower valve is installed and the building is finished. What still has to be done to the valve?
Show answerHide answer
Answer: A. Its maximum temperature limit must be set
These valves have a maximum temperature limit stop, and it has to be field adjusted per the manufacturer once hot water is available, since a valve out of the box is not set for the system it is in. Both codes cap the setting at 120 degrees F. Skipping the adjustment leaves a compliant valve delivering non-compliant water.
-
Question 20 of 20
A pump must deliver 30 psi at the outlet. Taking 1 psi as 2.31 ft of water, how many feet of head does that pressure represent?
Show answerHide answer
Answer: B. About 69 ft
Thirty psi at 2.31 ft per psi is 69.3 ft of head. The two conversion factors are reciprocals and are easy to transpose: 2.31 ft per psi going one way, 0.433 psi per foot going the other. A quick sanity check settles it every time. Pressure in psi is always a bigger number than the same head in feet is small, so converting psi to feet must make the number larger.
Look at which topics you missed, not just your score. Two misses in the same area tell you where to study next.
Want to focus on one area? Try the practice tests for venting, drainage, backflow, water heaters, fixtures, and math, or the IPC and UPC tests if you know which code your state uses.
Want more questions like these?
Journeyman Plumber Pro has 1,800+ practice questions with explanations, timed practice exams, and weak-area drills.